Previous Projects

University of Birmingham – Develop a strategy for Asset Surveying along with building an Asset Integrity Framework, develop templates for data capture and a working excel system to handle data capture,change,cost modeling, lifecycle,PPM generation. Covering all aspects of asset management and developing the support systems along with reducing/removing single point of failures.

Along with carrying out initial plant room surveys and first buildings to confirm the strategy and generated documentation before go live.

NHS Nationwide – Supporting surveys carried out by a main contractor we handled the Quality Control of data for a period of 10 months. With over 600 surgeries, clinics and hospitals covered.

  • Identifying data gaps
  • Costing assets
  • Building sites from multiple sources
  • Lifecycle Modeling
  • Quality Assessment of 30+ Surveyors
  • Rebuilding spreadsheets
  • Input of paper sheets to spreadsheet

Roseberry Park MiddlesboroughRoseberry Park in Middlesbrough – Comprehensive asset survey including all Mechanical and Electrical Equipment as well as Fire doors, Fire shutters and Fire dampers. A secure environment which does limit access to technology e.g. no smartphones or laptops making this a paper collection exercise.

Hospital ImagesQueen Alexandra Hospital Portsmouth – A fully comprehensive survey including some medical equipment and down to wheel chairs.

Direct Line House - BirminghamDirect Line Group Birmingham Office – Benchmark survey of all Mechanical and Electrical equipment. To show the value of the survey for client and value in the data gathering.

RBS GogarburnRBS World HQ Gogarburn, Edinburgh – Interim Scotland manager managing change, mobilisation,recruitment and introducing Carillion methods and processes. As well as responsibility for Critical Maintenance throughout the United Kingdom.

Southmead Hospital BristolSouthmead Hospital Bristol – Full mechanical and electrical asset survey. Also data gathering from drawings and plans due to access issues with a working hospital environment.

Shell QatarShell Qatar – Full asset and condition survey for Shell staff accommodation throughout the country.

Shell OmanPDO / Shell Oman – Full asset and condition survey throughout the country, managing and training several asset teams. Working alongside the client in reaching expectations within a difficult timeframe and budget.

AxA insurance HQAxA insurance headquarters Bristol – Asset and condition survey for AxA insurance at the headquarters and several satellite offices in the UK.

Siemens TurbinesSiemens Turbines Lincoln – Full Asset and condition survey throughout the Lincoln site and 13 other sites.

Orbit Housing Norfolk and SuffolkHousing and building surveyor for Orbit housing – Brought in to reduce a 6 month backlog and bring contract back into budget. Along with reducing complaints from tenants.

Jephson HousingHousing and building surveyor for Orbit Housing – Dealing with day to day repairs and maintenance issues on a contractual basis.